Enable text based alternatives for graph display and drawing entry

Try another version of this question

A bucket that has a mass of 30 kg when filled with sand needs to be lifted to the top of a 20 meter tall building. You have a rope that has a mass of 0.4 kg/m that must be secured to the bucket. It takes 1 meter of rope to secure the bucket. Once the bucket reaches the top of the building it only has mass 28 kg because there was a hole in the bottom and sand was leaking out at a constant rate while it was being lifted to the top of the building.

Find the work done lifting the bucket (sand and rope) to the top of the building.

  Joules

Get help: